Assembly of the magnet structure by the BNL magnet team was complete by September 2005

A fully assembled magnet girder
  Platen with pole pieces installed
  Close up of a few magnetic periods
After cleaning the girders, 115 pole pieces and 114 precisely sorted permanent magnets were installed in each girder. Shimming of the separate beams began in October 2005.

Use mouse-over to enlarge pictures

  Design of magnet array
  Magnets sorted by field strength